Creating a Production Batch

Last updated

This guide shows you how to create a production batch from a bill of materials, then complete it.

Before you start

You need a bill of materials for the finished product you want to produce. The finished product must have Is Batch Tracked enabled (labelled Use Batch Tracking on the product form).

Go to: Manufacturing > Production Batches

The Production Batches page with the New Batch button.

Step 1: Click New Batch

Click New Batch. Save is disabled until you select a bill of materials.

The New Batch form, with Save disabled until a bill of materials is selected.

Step 2: Select the bill of materials

Select the Bill of Materials. Save becomes enabled.

The New Batch form with a bill of materials selected and Save enabled.

Step 3: Save the batch

Click Save. The batch is saved as a Draft.

The draft production batch details with the Complete button.

Step 4: Complete the batch

Click Complete, then click Preview. The preview is a dry-run and nothing has been posted yet.

The completion preview, with the Confirm & Post button.

Step 5: Confirm and post

Click Confirm & Post. The batch is completed and a journal is posted. A message appears: "Batch completed and journal posted".

Step 6: See the batch in the list

Your new batch appears in the list with status Completed.

The Production Batches list showing the completed batch.

Step 7: Open the batch details

Click the batch to open the details.

The completed production batch details, with status Completed and the posted journal.

Important Notes

  • You need a bill of materials, and the finished product must have Is Batch Tracked enabled.
  • Save is disabled until you select a bill of materials. Saving creates a Draft.
  • Click Complete, then Preview, then Confirm & Post to complete the batch and post a journal.
Was this article helpful?

Still need help?

Ask our team on WhatsApp